Portable Site Office Power, Lighting & HVAC Installation | Al Mandoos Groups

Project Details

Location

Dubai – United Arab Emirates

Product Type

Porta Cabins

Company Name

Desert Oasis Contracting L.L.C.

Installation of Portable Site Power Socket, Lighting & HVAC by Al Mandoos Groups

Project Story: Installation and connection of Portable Site Office Power, Lighting, and HVAC systems for The Oasis Development – Phase 1A, 1B, 1E
Location: Dubai – United Arab Emirates
Client: Desert Oasis Contracting L.L.C.
Project Type: Portable Site Electrical and HVAC Installation
Project Status: Successfully Completed
Executed By: Al Mandoos Groups


Project Overview

Al Mandoos Groups successfully executed the installation of a complete Power Socket, Lighting, and HVAC system for the Portable Site Office of The Oasis Development (Phase 1A, 1B, 1E) located in Dubai, UAE. The project was undertaken for Desert Oasis Contracting L.L.C., ensuring full electrical and air conditioning functionality tailored to the client’s operational requirements.

The installation included distribution of 3G and 2G power sockets (13A & 16A) across multiple workstation areas, meeting rooms, pantry, and restrooms, along with floor boxes equipped with power and data ports to support office equipment and IT setups. A comprehensive lighting layout was implemented featuring LED tube lights and exhaust fans for optimal illumination and ventilation.

The HVAC system consisted of 1.5-ton and 2.0-ton split air conditioning units installed across the site office to maintain a comfortable indoor climate. All electrical wiring, conduit, and connection work were carried out according to approved shop drawings and safety standards.

This project showcases Al Mandoos Groups’ capability to deliver fully functional, energy-efficient, and safe electrical and mechanical installations for modular and prefabricated site offices, ensuring reliable operation for construction management teams.


Scope of Work

  • Installation of power socket distribution network (13A & 16A)

  • Installation of lighting fixtures and exhaust fans

  • Supply and installation of 1.5-ton & 2.0-ton HVAC units

  • Provision of floor boxes with integrated power and data ports

  • Complete electrical cabling and conduit routing as per design layout

  • Testing, commissioning, and final inspection of all electrical and HVAC systems


Project Features

  • Comprehensive Electrical Setup: Full coverage of workstation, meeting, and service areas with 13A/16A sockets

  • Modern Lighting Design: LED tube lights and exhaust ventilation for efficiency and comfort

  • Efficient HVAC Installation: Balanced cooling through 12 split units (1.5-ton & 2.0-ton)

  • Data Connectivity: Floor boxes integrated with power and data ports

  • Safety & Compliance: Installed as per KEO approved drawings and Dubai standards


Why This Project Matters

The successful completion of this installation ensured that the Portable Site Office at The Oasis Development was fully operational with dependable power, lighting, and climate control systems. It provided a comfortable and productive working environment for engineers, architects, and client representatives on-site.

Al Mandoos Groups once again demonstrated its technical expertise, attention to detail, and commitment to quality, reinforcing its reputation as a trusted partner in electromechanical and portable infrastructure installations across the UAE.