Portable Cabin Supply and Installation for SEWA Project by Al Mandoos Groups
Project Story:
Supply and Installation of a Portable Cabin to support operational, administrative, and site management activities for the SEWA infrastructure project involving the shifting of 220kV overhead transmission lines in the Shunoof area.
Project Details
Location:
Shunoof Area, Sharjah – United Arab Emirates
Client:
The Sharjah Electricity, Water, and Gas Authority (SEWA)
Main Contractor:
Dineshchandra R. Agrawal Infracon Private Limited – Abu Dhabi
Project Name:
SEWA Project – Shifting of 220kV OHL Lines in Shunoof Area
Project Type:
Portable Cabin – Supply & Installation
Project Status:
Successfully Completed
Executed By:
Al Mandoos Groups
Project Overview
Al Mandoos Groups successfully completed the supply and installation of a Portable Cabin for the SEWA Project – Shifting of 220kV Overhead Transmission Lines in the Shunoof Area, under the main contractor Dineshchandra R. Agrawal Infracon Private Limited – Abu Dhabi.
The portable cabin was installed to provide a dedicated workspace and site management facility for project personnel involved in the execution of critical utility infrastructure works. Designed for functionality, durability, and comfort, the cabin served as an essential operational hub supporting project coordination, supervision, and administrative activities.
Constructed using high-quality steel framing and insulated wall and roof panels, the portable cabin was engineered to withstand the demanding environmental conditions of the UAE while ensuring a comfortable working environment. The unit included provisions for electrical services, lighting, ventilation, and air conditioning, creating a fully functional workspace for site staff.
The scope of work included fabrication, transportation, positioning, anchoring, and final installation of the cabin in accordance with project specifications and safety requirements. All activities were carried out with minimal disruption to ongoing site operations and in compliance with SEWA standards.
This project demonstrates Al Mandoos Groups’ expertise in delivering reliable and efficient portable cabin solutions that support major infrastructure, utility, and energy projects across the UAE.
Scope of Work
- Supply of prefabricated portable cabin unit
- Transportation and delivery to project site
- Positioning, leveling, and anchoring of the cabin
- Electrical and utility-ready provisions
- Installation and finishing works
- Final inspection and project handover
Project Features
Infrastructure Support: Dedicated workspace for utility project operations
Durable Construction: Steel structure with insulated wall and roof panels
Comfortable Environment: Ventilation, lighting, and air-conditioning provisions
Fast Deployment: Quick installation with minimal site disruption
Safety Compliant: Installed according to project and SEWA requirements
Why This Project Matters
The Portable Cabin installation for the SEWA 220kV OHL Shifting Project played a vital role in supporting project management, engineering supervision, and administrative functions during the execution of critical power infrastructure works.
By delivering a durable and fully functional portable facility, Al Mandoos Groups contributed to the efficient execution of a key utility project that supports the ongoing development of Sharjah’s electrical transmission network. This project further strengthens Al Mandoos Groups’ reputation as a trusted provider of portable cabins and site infrastructure solutions for utility, infrastructure, and construction projects throughout the UAE.